FIX
Flooring installation

Flooring installation

Flooring

Get your new flooring installed correctly, including base preparation and leveling, to ensure a durable and attractive finish for your home.

Price
from10
Register for free

Professional and precise parquet installation. The price includes labor only.

Frequently asked questions

How long does it take to install flooring in a standard room?

The installation time depends on the size of the room, the condition of the base and the chosen technology. Usually, for a standard room of about 15-20 sq m, with a well-prepared base, the installation of a floor takes 1 to 2 working days, and with additional activities such as leveling or varnishing, the period may be extended.

Is it necessary to prepare the base before installing flooring?

Yes, the prepared base is key to the longevity of the flooring. It must be dry, flat and stable, free of dust, grease stains or old adhesives. If there are serious irregularities or humidity, additional steps are required such as leveling with a screed, laying an underlay and vapor barrier.

How do I care for the flooring after installation?

After installation, it is important to protect the flooring from strong moisture and aggressive detergents. It is recommended to clean it regularly with a slightly damp cloth and special detergents for wooden floors, as well as to place felt pads under the furniture to avoid scratches. If necessary, sanding and varnishing can be done later to refresh the surface.

How to order

  1. 1.Describe the problem or desired service in the search field
  2. 2.Get offers from verified professionals in minutes
  3. 3.Choose the offer and schedule a convenient time

from

ago 0 min.