
Installation of industrial flooring (Epoxy floors)
Flooring
This service installs epoxy flooring, a highly durable and impact-resistant surface suitable for garages, workshops, and basements.
Epoxy flooring is the perfect choice for modern industrial spaces. They offer not only an elegant appearance, but also high durability and impact resistance. These floorings are chemically resistant and can be customized to the specific needs of your spac
Frequently asked questions
How long does it take to install an epoxy floor?
For an area of 300 to 500 m2, a standard system is implemented in 2 to 4 days, including preparation and technological breaks. Return to service is usually within 24 to 72 hours depending on the temperature and type of coating.
What is the difference between epoxy and polyurethane flooring?
Epoxy is harder and more resistant to chemicals and abrasion. Polyurethane is more elastic and better tolerates thermal shocks and vibrations. We often combine systems according to zones and load.
Can it be laid on old concrete or old flooring?
Yes, if the substrate is sound and dry. We perform mechanical preparation and adhesion tests. If necessary, we remove old layers, level them and then apply the new system.
How to order
- 1.Describe the problem or desired service in the search field
- 2.Get offers from verified professionals in minutes
- 3.Choose the offer and schedule a convenient time
