
Installation of concealed mounting PT
Electrical
Get flush-mounted electrical distribution boards installed to hide wiring and ensure safe, organized power distribution throughout your home.
We install flush-mounted distribution boards that are aesthetically pleasing and safe.
Frequently asked questions
How long does it take to install a concealed installation PT?
The installation time depends on the condition of the installation and access to the site, in standard cases it takes between 30 minutes and 1 hour, including testing and setting the operating mode.
Is pre-wiring required for installation of a flush-mounted PT?
Yes, it is necessary to have wiring and a suitable console or panel for concealed installation. In the absence of such, our team can build or adjust the installation according to the requirements.
Can I install a concealed installation PT myself?
Self-installation is not recommended because incorrect connection can lead to damage to appliances and a safety risk
How to order
- 1.Describe the problem or desired service in the search field
- 2.Get offers from verified professionals in minutes
- 3.Choose the offer and schedule a convenient time
