
Installation of control electricity meters
Electrical
Install additional electricity meters to accurately measure and control power consumption in specific areas or rooms within your property.
Placement of additional electricity meters for accurate measurement and control of electricity consumption in separate areas or rooms. The price is for labor.
Frequently asked questions
How long does installation take?
Usually from 2 to 6 hours depending on the complexity, number of phases and the need for additional work on the board. For larger projects, we plan a phased organization without completely stopping your work.
Is remote reading possible?
Yes, we offer models with Modbus, M Bus or Ethernet communication, as well as integration with energy monitoring systems. We will recommend the most suitable option according to your infrastructure.
Are current transformers needed?
For higher currents and three-phase systems, they are often needed. For smaller loads, direct measurement is possible. We determine the exact configuration upon inspection.
How to order
- 1.Describe the problem or desired service in the search field
- 2.Get offers from verified professionals in minutes
- 3.Choose the offer and schedule a convenient time
